What are the 17 key points of pneumatic conveying system design?

In the process of designing and conceptualizing a pneumatic conveying system, it is necessary to fully combine and analyze the initial conditions of the design concept, such as material characteristics, basic parameters of conveying conditions, etc., to determine the type of pneumatic conveying system, and to determine the layout of conveying pipelines and their basic elements such as conveying volume, mixing ratio, and airflow velocity. As a highly automated and precisely controlled conveying system, the force conveying system needs to consider multiple key factors comprehensively in the design and implementation process. If one factor is not properly considered, it may lead to low operational efficiency of the entire system, or even the inability to meet process requirements. Next, we will introduce the 17 key points of pneumatic conveying system design with the guidance of environmental protection:

1. The pneumatic conveying system technician also needs to analyze the initial design conditions.

The initial condition includes the material characteristics involved in the pneumatic conveying system, basic parameters of the conveying condition, etc. In addition, flammable and explosive materials require stricter and more careful handling.

2. Determine the type of pneumatic conveying system.

Based on the basic parameters of the initial condition, such as material characteristics, determine whether the conveying type is positive pressure conveying, negative pressure conveying, or mixed conveying.

3. Determine the layout of the conveying pipeline.

At the same time as determining the layout of the conveying pipeline, it is also necessary to determine the structural types of the main components and draw a system layout diagram, avoiding obstacles on site as much as possible according to customer requirements. And it is also necessary to ensure the operation of the pneumatic conveying system.

4. Determine the conveying capacity

Calculate and determine the conveying capacity design of the pneumatic conveying system based on the annual conveying volume, annual operating days, work regularity, and various types of process configurations of the enterprise.

5. Determine the mixture ratio of raw materials and gases.

The material to air ratio refers to the influence of the specific gravity of materials and air during the material transportation process.

6. Determine the airflow velocity for material transportation.

What type of Roots blower, centrifugal blower, or other gas source is needed to affect the airflow velocity!

7. Calculate the amount of air required to be conveyed by the pneumatic conveying system.

8. Calculate the diameter of the conveying pipeline.

Affects the conveying capacity of the pneumatic conveying system

9. Determine the main component structure and relevant specifications of the pneumatic conveying system.

Including: ① the horizontal distance, vertical height, inclination angle, number of bends, pipeline structure, material, and support of the conveying pipeline; ② Types, structures, materials, and quantities of bifurcation pipes and switching valves; ③ The type, specification, material, and nozzle orientation of separators and dust collectors.

10. Calculate the pressure loss of the pneumatic conveying system.

Number of bends and vertical height

11. Select the type and capacity of the pneumatic conveying system fan based on the required conveying air volume, total pressure loss, and related design conditions.

12. Choose the type and capacity of the motor.

13. Determine the required motor equipment and ancillary equipment.

14. Determine the start stop operation sequence, interlock safety devices, and determine the type and capacity of the control panel.

15. Determine the specific location of the suction and exhaust ports, whether to add noise reduction devices, and determine the dust removal measures.

16. Develop installation, debugging and operation procedures.

17. Prepare the types and quantities of vulnerable parts and spare parts required.

Related products / Related products

  • Pneumatic conveying system

    Pneumatic conveying system

  • Pneumatic conveying system

    Pneumatic conveying system

  • Pneumatic conveying system

    Pneumatic conveying system

  • Dust suction truck

    Dust suction truck

2024  Jinan Xinlu Quansheng Machinery Equipment Co., Ltd    

主站蜘蛛池模板: 亚洲综合在线观看视频 | 免费观看中文字幕 | 久久精品成人一区二区三区 | 自由成熟的性色视频免费观看 | 亚洲国产精品成人综合久久久 | 福利精品 | 欧美在线精品永久免费播放 | 日韩理论片在线观看 | 亚洲欧美另类色妞网站 | 俺去啦婷婷 | 欧美xx网站| 国产麻豆视频在线观看 | 亚洲三级中文字幕 | 激情综合色综合久久综合 | 永久免费毛片在线播放 | 亚洲精品久久久久中文字幕一区 | 欧美jizz18欧美 | 欧美三级在线观看视频 | 一二三四观看视频中文在线观看 | 精品久久影院 | 亚洲欧美成人中文在线网站 | 日本啊啊啊 | 欧美18-19sex性| 国产精品3 | 日韩一级片免费看 | 国产69久久精品成人看小说 | 欧美激情久久久久久久大片 | 欧美日韩国产不卡在线观看 | 亚洲精品在线观看视频 | 久久亚洲国产最新网站 | 亚洲天堂中文字幕在线观看 | 成人伦理影院 | 欧美成人h版影片在线观看 欧美成人h版影院在线播放 | 久久www免费人成看国产片 | 国产成人99久久亚洲综合精品 | av中文字幕网免费观看 | 国产精品a v 免费视频 | 中文字幕在线视频网站 | 日韩欧美国产一区二区三区四区 | 亚洲全网成人资源在线观看 | 国产乱码一区二区三区四区 |