In the process of designing and conceptualizing a pneumatic conveying system, it is necessary to fully combine and analyze the initial conditions of the design concept, such as material characteristics, basic parameters of conveying conditions, etc., to determine the type of pneumatic conveying system, and to determine the layout of conveying pipelines and their basic elements such as conveying volume, mixing ratio, and airflow velocity. As a highly automated and precisely controlled conveying system, the force conveying system needs to consider multiple key factors comprehensively in the design and implementation process. If one factor is not properly considered, it may lead to low operational efficiency of the entire system, or even the inability to meet process requirements. Next, we will introduce the 17 key points of pneumatic conveying system design with the guidance of environmental protection:

1. The pneumatic conveying system technician also needs to analyze the initial design conditions.

The initial condition includes the material characteristics involved in the pneumatic conveying system, basic parameters of the conveying condition, etc. In addition, flammable and explosive materials require stricter and more careful handling.

2. Determine the type of pneumatic conveying system.

Based on the basic parameters of the initial condition, such as material characteristics, determine whether the conveying type is positive pressure conveying, negative pressure conveying, or mixed conveying.

3. Determine the layout of the conveying pipeline.

At the same time as determining the layout of the conveying pipeline, it is also necessary to determine the structural types of the main components and draw a system layout diagram, avoiding obstacles on site as much as possible according to customer requirements. And it is also necessary to ensure the operation of the pneumatic conveying system.

4. Determine the conveying capacity

Calculate and determine the conveying capacity design of the pneumatic conveying system based on the annual conveying volume, annual operating days, work regularity, and various types of process configurations of the enterprise.

5. Determine the mixture ratio of raw materials and gases.

The material to air ratio refers to the influence of the specific gravity of materials and air during the material transportation process.

6. Determine the airflow velocity for material transportation.

What type of Roots blower, centrifugal blower, or other gas source is needed to affect the airflow velocity!

7. Calculate the amount of air required to be conveyed by the pneumatic conveying system.

8. Calculate the diameter of the conveying pipeline.

Affects the conveying capacity of the pneumatic conveying system

9. Determine the main component structure and relevant specifications of the pneumatic conveying system.

Including: ① the horizontal distance, vertical height, inclination angle, number of bends, pipeline structure, material, and support of the conveying pipeline; ② Types, structures, materials, and quantities of bifurcation pipes and switching valves; ③ The type, specification, material, and nozzle orientation of separators and dust collectors.

10. Calculate the pressure loss of the pneumatic conveying system.

Number of bends and vertical height

11. Select the type and capacity of the pneumatic conveying system fan based on the required conveying air volume, total pressure loss, and related design conditions.

12. Choose the type and capacity of the motor.

13. Determine the required motor equipment and ancillary equipment.

14. Determine the start stop operation sequence, interlock safety devices, and determine the type and capacity of the control panel.

15. Determine the specific location of the suction and exhaust ports, whether to add noise reduction devices, and determine the dust removal measures.

16. Develop installation, debugging and operation procedures.

17. Prepare the types and quantities of vulnerable parts and spare parts required.

Related products / Related products

  • Pneumatic conveying system

    Pneumatic conveying system

  • Pneumatic conveying system

    Pneumatic conveying system

  • Pneumatic conveying system

    Pneumatic conveying system

  • Dust suction truck

    Dust suction truck

2024  Jinan Xinlu Quansheng Machinery Equipment Co., Ltd    

主站蜘蛛池模板: 香蕉狠狠再啪线视频 | 欧美综合自拍亚洲综合百度 | 成人a毛片一级 | 日韩视频在线一区 | 欧美大尺寸 | 欧美亚洲国产精品久久久 | 国产永久一区二区三区 | a天堂视频| 91精品国产91热久久p | 亚洲无线一二三四区 | 久久精品国产精品亚洲精品 | 久久久亚洲精品视频 | 国产jizzjizz免费看麻豆 | 痴汉系列aⅴ | 在线看v | 最新亚洲精品国自产在线 | 午夜dj在线观看免费高清视频在线观看 | 酒色成人网 | 欧美精品久久久久久久影视 | 亚洲国产一区二区三区在线观看 | 中文字幕第一 | 日本欧美一区二区三区免费不卡 | 日韩欧美亚洲国产精品字幕久久久 | 91丨九色丨首页在线观看 | 国产成人精品曰本亚洲 | 亚州都市春色校园小说另类 | 亚洲一级香蕉视频 | 国产免费一级精品视频 | 欧美在线精品永久免费播放 | 国产亚洲欧美日韩在线观看一区二区 | 午夜宅男视频 | 亚洲视频精品在线观看 | 第一色网站 | 国产欧美国产精品第一区 | 亚洲视频黄 | 日本欧美精品 | 亚洲性色成人 | 一区二区三区四区在线播放 | 国产精品视频国产永久视频 | 伊人影院视频 | 欧美日韩中文 |